







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Anaheim, CA: What the Job Really Takes
Cabinets & countertops in Anaheim usually run $14,000 – $45,000 for a full tear-out and replacement, and most homes are finished in three to five weeks from demo to final caulk. A straight swap of doors and slabs can land closer to $6,000 – $8,000 and wrap in under two weeks. Call (888) 255-9354 and we’ll walk your kitchen, check the walls and plumbing, and give you a written, line-item number before anyone touches a cabinet.
How a cabinet and countertop job actually runs, stage by stage

Anaheim kitchens are tight. Pre-war bungalows off the Colony District have galley runs under eight feet wide, and 1960s ranch plans in 92806 squeeze the sink against a shared bedroom wall. That changes the schedule, because a 24-inch box that has to clear a return wall gets measured twice. Here’s the sequence we work to.
Stage 1 – Measure and confirm the layout (day 1, about 90 minutes)
We laser-measure every wall, check for out-of-square corners and floor level, and photograph the plumbing and electrical rough-ins under the sink and behind the range. You decide the door style and whether the sink stays where it is. If a wall is off by more than half an inch, we flag it now rather than after the boxes arrive.
Stage 2 – Demo, haul-out, and wall prep (days 2 – 3)
Old cabinets come out and go to the truck, not the driveway. We cut back damaged drywall, patch and prime, and check the shutoff valves. On a 1950s Anaheim home this is where we find galvanized supply lines or a receptacle with no ground, and you get a price for correcting it before the install crew is scheduled.
Stage 3 – Cabinet install and shim (days 4 – 7)
Base cabinets set first, leveled and shimmed to the highest point of the floor, then uppers on ledger and blocking. We scribe fillers to the walls so the reveal reads straight even when the wall isn’t. You approve door swing and drawer placement at this point, because moving a pull-out later means pulling the box.
Stage 4 – Template and slab fabrication (days 8 – 12)
Once the bases are locked in, the countertop gets templated. Stone and quartz are cut off measurements taken after cabinet install, never before. That five-day gap is fabrication time, and it’s the single longest wait on the job. Sink and faucet are on site by day 10 or the install slips.
Stage 5 – Countertop set, sink, caulk, punch list (days 13 – 16)
Slabs set on the cabinets, sink and faucet connected, seams and backsplash joint caulked. We run water, check for leaks, and walk the punch list with you. Adjustable hinges and drawer glides get one final tune after everything has settled for a day.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll actually choose between
Most of the decisions land in three buckets: the boxes, the doors, and the slab.
- Cabinet box grade. Plywood boxes hold screws and survive moisture far better than particleboard, and in a kitchen with a dishwasher and sink within arm’s reach of each other that matters. Particleboard runs cheaper by a few thousand on a typical Anaheim run.
- Door construction. Solid wood and MDF-core doors paint clean; thermofoil is cheaper but peels at the edges after a decade of heat near the range. KraftMaid and Wellborn both sit in the mid-to-upper range and give you real finish options.
- Countertop material. Quartz holds up to daily use and doesn’t need sealing. Granite is still competitive on price and adds natural movement. Laminate is the least expensive and can look sharp in a small galley, but it chips at the sink edge.
- Edge profile and thickness. A standard eased edge is included. A thick mitered edge or a waterfall end adds cost and needs a slab with enough material to wrap.
- Sink configuration. Undermount sinks need the slab cut and polished; a drop-in sink can be done after the slab is set and is a legitimate budget choice.
What Cabinets & Countertops costs in Anaheim, CA

A full replacement runs $14,000 – $45,000. Cabinet installation on its own sits at $4,000 – $13,000, countertop installation $2,000 – $6,500, and a kitchen island adds $3,000 – $10,000. Here’s what moves a job to the low or high end.
- Linear feet and box count. A 10-foot galley in 92805 lands in the low range. A 20-foot run with an island in a 92807 ranch home pushes it up.
- Wall and floor condition. Out-of-square walls, soft subfloor, or a wall that needs furring adds carpentry and drywall time.
- Moving plumbing or electrical. Relocating the sink a few feet means rerouting drain and supply; adding a receptacle for a wall oven is a separate trade.
- Material grade. Stock boxes with laminate sit at the bottom; semi-custom KraftMaid or Wellborn with quartz sits at the top.
- Permit scope. A straight swap usually needs no permit. Moving a wall, gas line, or circuit does, and Anaheim’s building division has its own review timeline.
A written estimate lists cabinet boxes and doors separately, countertop material and square footage, demo and haul-out, sink and faucet labor, and permit fees where they apply. What typically isn’t included: plumbing or electrical relocation, wall removal, and appliance purchase. We quote those in writing before work starts, and the number in the estimate is the number you pay. Our 730-Day Done Right Promise covers the workmanship for two years past install.
See the difference
Before
After
Before
After
Before
AfterWhat Anaheim homes specifically do to this job
Anaheim is two housing markets stacked on top of each other. Near downtown in 92805 you’re working in century-old bungalows and Craftsmans where the kitchen was originally a back porch, so the floor slopes, the walls aren’t plumb, and the plumbing has been patched a few times. Out in 92806 and 92807 you’re in post-war and 1960s tract ranches with tighter doorways and shallow cabinet runs. Both come with the same wrinkle: permits go through Anaheim’s own building division, not the county, and the review clock is set locally. Anaheim Hills jobs also mean slope access and haul-out routes that a flatland subdivision never deals with. We plan deliveries around parking and alley access on the older blocks rather than assuming a driveway is available. If the wider project includes layout changes or wall removal, that work sits under Kitchen Remodeling in Anaheim, and homeowners often pair a cabinet refresh with Walk-In Showers & Shower Remodeling in Anaheim or Tub-to-Shower Conversion in Anaheim while the house is already torn up. We cover the whole city through our Anaheim service area, and the cabinet and countertop work is a focused piece of our Kitchen Remodeling service.
Serving Anaheim, CA – Our Local Coverage Area
We serve Anaheim and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Cabinets & Countertops in Anaheim

Three to five weeks for a full replacement, with cabinet install and countertop fabrication being the two long poles. A simple door-and-slab swap can finish in under two weeks, and we’ll give you a dated schedule in writing before demo. Call (888) 255-9354 for an exact timeline on your kitchen.
Usually not, if you’re replacing like-for-like and not moving plumbing, gas, or electrical. Moving a sink, adding a circuit, or taking out a wall pulls the job into Anaheim’s building division review, which adds time and a fee. We tell you up front which side of that line your job falls on, and we pull the permits when they’re needed.
Yes, and it’s the most common way we do it. Keeping the sink where it is means no drain rerouting and no wall opening, which keeps the price in the lower half of the range. If you want the sink under a window that doesn’t have one, that’s a plumbing change and gets quoted separately.
Expect $14,000 – $45,000 for a full replacement, with cabinet-only work at $4,000 – $13,000 and countertops at $2,000 – $6,500. Galley kitchens in 92805 tend toward the low end; a 92807 home with an island and quartz pushes toward the top. Call (888) 255-9354 for a free written estimate.
Every job is covered by our 730-Day Done Right Promise: if something isn’t done right, we come back and make it right. Cabinet and countertop manufacturers also carry their own product warranties, and we hand you the paperwork. Call (888) 255-9354 and we’ll walk you through both on the estimate.
Get a free cabinets & countertops estimate in Anaheim
Call (888) 255-9354 to book a free on-site estimate. We’ll measure the kitchen, check the walls and rough-ins, and hand you a written line-item price with the material options spelled out. A live person answers around the clock, technicians arrive background-checked and in uniform, and projects over $10,000 get $1,000 off with 0% financing for 18 months available. The number you see is the number you pay.
Written by the team at Groundwork Construction Co.












