Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Coto de Caza: What the Job Actually Costs and How Long It Takes
New cabinets and countertops in Coto de Caza run $14,000 – $45,000 for most kitchens, and a typical cabinet-and-countertop swap takes 2 – 3 weeks from tear-out to final caulk. The wide range isn’t a sales tactic. It’s the difference between painting and refacing the boxes you already have, versus taking the room down to the studs and rebuilding the layout. Call (888) 255-9354 and we’ll talk through which end of that range your kitchen actually sits on.
How We Run a Cabinet and Countertop Job, Stage by Stage

Most contractors say “we manage the project.” Here’s what that actually looks like on a calendar, so you know when you’ll be without a kitchen and when you’ll be making decisions.
Stage 1: Site Measure and HOA Submittal (Week 1)
We measure every wall to the sixteenth of an inch, check the cabinet boxes for plumb, and photograph the electrical and plumbing rough-ins before anything moves. In Coto de Caza this is also the week we prepare the design-review paperwork for your HOA’s architectural committee, since the palette rules here mean finish colors and door styles get approved before we order. You’ll decide the finish, door profile, and hardware at this stage. Approvals typically take 10 – 21 days at the gate community here, so this week matters.
Stage 2: Tear-Out and Prep (Days 1 – 2)
Demo of the old cabinets, countertops, and backsplash takes a day for a standard kitchen. The second day is prep: repairing drywall, moving outlets and drain lines if the layout changed, and setting a new level line on the floor and wall. You’re choosing whether to relocate the sink while we’re still in this window. Moving plumbing here costs $600 – $1,400 more than keeping it in place.
Stage 3: Cabinet Installation (Days 3 – 6)
Cabinets go in and get shimmed, leveled, and screwed into studs, not just the drywall. Boxes get installed before doors and drawers so the reveal lines line up. KraftMaid, which we use on many Coto de Caza kitchens, ships in 2 – 4 weeks on most standard doors and 6 – 10 weeks on fully custom finishes. You’ll confirm whether you want full-extension soft-close drawers ($150 – $400 per drawer bank more) or standard slides.
Stage 4: Template and Countertop Fabrication (Days 7 – 12)
Once the base cabinets are set, the fabricator templates the countertops. Quartz templating and fabrication usually take 5 – 7 business days; natural stone like granite or marble can take 7 – 10. You’re picking the slab, edge profile, and sink cutout in this window. This is the stage most projects lose a week on, because slab selection happens after the cabinets arrive instead of before.
Stage 5: Install, Backsplash, and Final Walkthrough (Days 12 – 18)
Countertops set, sink and faucet plumbed in, backsplash tiled, and the punch list walked with you in person. We don’t call it done until you’ve opened every drawer and turned on every fixture. When you’re ready to see a whole kitchen put back together, that’s the moment the wider scope matters, and you can read about our Kitchen Remodeling in Coto de Caza work to see how the pieces connect.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Be Choosing Between
- Stock semi-custom cabinets (KraftMaid, off-the-shelf finishes): $4,000 – $9,000 for a standard kitchen in Coto de Caza. Ships in 2 – 4 weeks, holds up well for 15 – 20 years, but you pick from a fixed palette. Best fit if your HOA palette is already restricted.
- Full custom cabinets: $12,000 – $22,000. Every dimension, pull-out, and interior fit is made to your kitchen. For a 1980s Coto de Caza kitchen with an odd corner or a built-in pantry, this is where you spend money once instead of twice.
- Quartz countertops: $2,000 – $6,500 depending on square footage. Non-porous, doesn’t need sealing, handles heat and daily use. There’s a reason it’s what most of our Coto de Caza clients pick.
- Granite: Same price band, real stone, no two slabs alike. Needs resealing every 1 – 2 years. It shows better on a wide island, less so on a tight galley.
- Marble or other natural stone: $5,500 – $12,000 on a large kitchen. Beautiful, softer under heat and knives. Better for a butler’s pantry or a home where baking happens more than stir-frying.
- Solid-surface (Corian-type): $1,500 – $4,000. Seamless and repairable, but reads as dated on resale. We advise against it in a kitchen this size.
- Cabinet refacing: $3,000 – $7,000. Keeps the boxes, replaces doors, drawers, and veneer. Fast and inexpensive, but only worth it if the existing cabinet boxes are solid and the layout is already right.
What Cabinets & Countertops Cost in Coto de Caza, CA

Our lead range for cabinets and countertops in Coto de Caza is $14,000 – $45,000. A cabinet-only install lands at $4,000 – $13,000. A countertop-only job lands at $2,000 – $6,500. Kitchen island installation adds $3,000 – $10,000 when the island is new construction, and backsplash runs $800 – $2,500.
Four variables push a job from the low end to the high end:
- Kitchen square footage. A 120-square-foot kitchen in The Village versus a 500-square-foot great-room kitchen in Los Ranchos is a material difference of $8,000 – $15,000 before any finish upgrade.
- Layout changes. Relocating a sink, moving a gas line, or shifting a wall to open the room adds $1,500 – $6,000 in plumbing, electrical, and structural costs. Keeping the existing layout saves most of that.
- Material grade. Semi-custom KraftMaid cabinets with quartz is the mid-range. Fully custom boxes with marble move you to the top of the band.
- Existing condition. A 1990s kitchen with worn drywall and old wiring needs more prep than a 2015 kitchen, and we build that into the estimate, not the change order.
- HOA-driven approval and access. The single gate and design-review process here can add two weeks to the schedule and $400 – $1,200 to the project in admin, re-inspection, and delayed-delivery costs.
Every estimate we write is line-itemed: cabinets, countertops, labor, demo, HOA paperwork, permits where required. Not buried. The number we quote is the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhat Coto de Caza Homes Specifically Do to This Job
Coto de Caza isn’t Mission Viejo with a gate on it. The whole community sits behind a single guarded entrance off Coto de Caza Drive, and every contractor, delivery truck, and countertop slab has to be scheduled through the security gate. We plan material deliveries around gate windows, because a late countertop template doesn’t just cost us a day, it costs your kitchen a day. Your HOA’s architectural committee also approves your palette, finish, and door style before we order, so your finish selection happens in week one, not week four.
The housing stock here is mostly 1980s-90s Mediterranean and Santa Barbara-style homes in planned villages like Los Ranchos, The Village, and Weatherly, plus an equestrian pocket of homes with barns and arenas off the trail system. We work on a lot of those original kitchens, where the cabinet boxes are still solid but the doors, hinges, and hardware have aged out, and where the original tile countertops are often the biggest obstacle to a modern layout. The hot, dry summers and Santa Ana winds here do less damage inside a kitchen than they do to your roof, but they do mean that the exterior door and window that opens onto your kitchen should be checked for weather-stripping while we’re in the room.
We cover the full Coto de Caza area, including the neighborhoods above, and we handle the HOA paperwork and gate scheduling on every job so you aren’t the one making those calls. Other work in the home often pairs well, and homeowners frequently add a Walk-In Showers & Shower Remodeling in Coto de Caza or a Tub-to-Shower Conversion in Coto de Caza while we’re already on-site. If the countertop and cabinet swap is part of a larger effort, our Kitchen Remodeling team can fold it into a single plan.
Cabinets & Countertops in Coto de Caza: Frequently Asked Questions

Most cabinet and countertop projects here take 2 – 3 weeks from tear-out to walkthrough, with the fabrication phase adding 5 – 10 days if the countertop is a custom slab. HOA approval typically adds another 10 – 21 days before demolition starts, so plan on a 4 – 6 week total window from signed contract to final walkthrough.
Cabinet and countertop replacement alone usually doesn’t trigger a building permit, but any new electrical outlet, plumbing relocation, or gas line move does, and we pull those. The bigger approval here is the HOA’s design review, which we handle for you. Call (888) 255-9354 and we’ll confirm which permits your specific project needs before we start.
Yes. The design-review submittal is part of our process on every Coto de Caza job. We build the finish and material selection around the HOA’s approved palette from the first meeting, so approved colors aren’t a surprise at inspection. If you haven’t reviewed the current palette in a while, ask your HOA for the latest list before we sit down.
Cabinet installation alone runs $4,000 – $13,000. Countertop installation alone runs $2,000 – $6,500. The two together, with backsplash and any island work, lands in the $14,000 – $45,000 range depending on size and finish. Call (888) 255-9354 for a free on-site estimate that puts real numbers to your kitchen.
Every project is covered by our 730-Day Done Right Promise. If something we installed fails to hold up, we make it right, for two full years from the final walkthrough. Manufacturer warranties on KraftMaid cabinets and quartz counters run separately and we hand you the paperwork at closeout.
Serving Coto de Caza, CA – Our Local Coverage Area
We serve Coto de Caza and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Get a Free Estimate on Cabinets & Countertops in Coto de Caza
Call (888) 255-9354 for a free on-site estimate. We’ll walk your kitchen, measure, note any HOA or permit needs, and hand you a line-item quote within a few days. No sales pressure, no vague ranges. Just a real number and a written scope, backed by the 730-Day Done Right Promise and 0% financing for 18 months on approved projects over $10,000.
Written by the team at Groundwork Construction Co.