







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Garage Conversion ADU in Laguna Hills, CA: What It Takes and What It Costs
A garage conversion ADU in Laguna Hills typically runs $45,000 – $130,000 and takes 3 to 5 months from permit submittal to final inspection, depending on whether you move plumbing and how finished you want the space. Most conversions we build here turn an attached two-car garage into a 400 – 500 sq ft studio or one-bedroom unit with its own kitchenette and bath. Call (888) 255-9354 to schedule a free on-site estimate and we’ll walk your garage and give you a written line-item number.
How a Garage Conversion ADU Comes Together, Stage by Stage

Your garage is already framed, roofed and sitting on a slab. That head start is why a conversion costs a fraction of a ground-up build. The work is in code upgrades, not structure. Here’s the real sequence.
Stage 1: Feasibility and permit set (weeks 1 – 4)
We measure the garage, check ceiling height and slab condition, and confirm the setback and lot coverage for your lot in the 92653 zip. You decide the layout: studio versus one-bedroom, galley kitchenette versus full kitchen. A designer drafts the plan set and we submit to the City of Laguna Hills for plan check. This is the slowest stretch because it sits in the city’s queue, not ours.
Stage 2: Demo and rough-in (weeks 5 – 8)
Out goes the garage door, the opener and any shelving. We frame the new front wall with a window and entry door, then run the rough electrical, plumbing and HVAC. If the garage slab sits below the finished floor of the house, we build up a raised subfloor so the unit drains and steps correctly. You pick fixture locations now, because moving a drain line after the slab is cut gets expensive fast.
Stage 3: Insulation and drywall (weeks 9 – 11)
Garage walls were never insulated for living space. We insulate to Title 24 requirements, seal the ceiling, and hang drywall. This is the week your garage stops looking like a garage.
Stage 4: Finishes (weeks 12 – 15)
Flooring, cabinets, countertops, tile, paint and fixtures go in. You choose these at stage 1 so nothing stalls here. Homeowners often pair this with Cabinets & Countertops in Laguna Hills when they want the kitchenette to match the main house.
Stage 5: Final inspections and handoff (weeks 16 – 18)
Building, electrical, plumbing and mechanical inspections clear, then the final. We walk the unit with you, fix the punch list, and hand over the keys.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Shape Your Conversion
Most of the decisions are yours, and each one swings the budget. Here’s what actually gets picked between.
- Layout: A studio keeps plumbing on one wall and lands near the low end. A one-bedroom with a full bath and kitchen costs more but rents higher. Decide before the plan set is drawn.
- Kitchenette versus full kitchen: A sink, two-burner cooktop and small fridge fits a corner and saves money. A full kitchen needs more circuits and counter run.
- Flooring: Luxury vinyl plank handles moisture and cleans up fast; it’s the practical pick for a rental unit. Porcelain tile runs cooler and lasts longer. Carpet only suits a home office conversion.
- Bath: A prefab shower surround is the budget move. A tiled walk-in shower with a linear drain adds several thousand but holds up and looks better.
- Exterior cladding: We match your existing stucco and set it off with James Hardie lap siding on the new front wall where the design calls for it. Fiber cement holds paint well in this sun.
- HVAC: A ductless mini-split is the common choice for a single room. If the unit has two rooms, a small ducted system makes more sense.
- Garage door opening: You remove it entirely, or you keep a garage bay and convert only one side. Keeping a bay cuts square footage but keeps parking.
What a Garage Conversion ADU Costs in Laguna Hills, CA

The range is $45,000 – $130,000, and the spread is real. A simple studio at the low end. A finished one-bedroom with a full kitchen and custom tile at the high end. Here’s what moves the number:
- Size: A 400 sq ft single-car conversion lands near $45,000 – $70,000. A 500+ sq ft two-car conversion runs $75,000 – $130,000.
- Plumbing distance: Running a drain to the main sewer line across the yard adds cost. Keeping the bath close to the existing stack saves it.
- Electrical service: If your panel has room, the rough-in is straightforward. A panel upgrade and new subpanel adds to the total.
- Slab and subfloor work: A garage slab below grade needs a raised floor. A flat slab doesn’t.
- Finish grade: Builder-grade cabinets and vinyl plank versus KraftMaid cabinets and tile throughout is a several-thousand-dollar gap.
A written estimate from us itemizes framing, rough trades, insulation, drywall, finishes, permits and inspections line by line. What it won’t include unless you ask: furniture, appliances you buy yourself, and landscaping around the new entry.
See the difference
Before
After
Before
After
Before
AfterWhat Laguna Hills Homes Specifically Do to This Job
Laguna Hills was built largely in the 1970s around the old Laguna Hills Mall and the I-5/SR-73 junction, so almost every garage we convert is original tract construction. That matters. The original tract plans put bearing walls and plumbing chases in predictable places, which means we bid faster and know where the old galvanized supply lines run before we cut a slab. Garages in these tracts often sit a step below the house floor, so the raised subfloor is a routine part of the job here, not an exception. Because entire tracts were built at once, neighbors on the same street hit the same milestones together, and that includes the re-piping many of these homes need before a conversion goes in. Inland south Orange County’s warm, dry climate means we build through a long exterior season, but the same sun punishes the stucco and trim on the new front wall, so we use materials that hold up. We cover all of Laguna Hills, and our Laguna Hills service page lays out the wider area. If your conversion is the first phase of a bigger plan, it’s usually part of a full Home Additions & ADU in Laguna Hills scope.
Serving Laguna Hills, CA – Our Local Coverage Area
We serve Laguna Hills and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Garage Conversion ADU in Laguna Hills

A garage conversion ADU in Laguna Hills takes 3 to 5 months from permit submittal to final inspection. Plan check is the biggest variable; construction itself runs 10 to 14 weeks. Call (888) 255-9354 for a schedule based on your garage.
Yes, a garage conversion ADU in Laguna Hills requires a building permit and separate electrical, plumbing and mechanical permits. Converting a garage to living space removes a parking spot, so the city reviews that too. We pull the permits and coordinate every inspection, which is part of our Home Additions & ADU work.
Often yes. Many Laguna Hills conversions keep the bath against an existing exterior wall and tie into the house’s sewer line close by, which avoids cutting the slab across the garage. That’s a layout decision we make at the feasibility stage.
Expect $45,000 – $130,000 for a garage conversion ADU in Laguna Hills, with the midpoint around $75,000 for a one-bedroom unit. Size, plumbing distance, panel capacity and finish grade drive the spread. Call (888) 255-9354 for an exact quote; estimates are free.
Every garage conversion ADU we build carries our 730-Day Done Right Promise. If something isn’t done right, we make it right. Our technicians have up to 12 years of experience, and we’re licensed and insured.
Get a Free Estimate for Your Garage Conversion in Laguna Hills
Call (888) 255-9354 to schedule a free on-site estimate. A live person answers 24/7. We’ll walk your garage, confirm what the conversion needs in your tract, and put a written line-item number in your hands. Projects over $10,000 get $1,000 off, and 0% financing for 18 months is available. Upfront pricing, no surprises.
Written by the team at Groundwork Construction Co.












