Vanities, Tile & Fixtures in Irvine, CA: What the Job Costs and How Long It Takes
Replacing a bathroom vanity, tiling the floor and shower walls, and swapping out fixtures in Irvine typically runs $9,000 to $28,000 for a full primary bath, and takes three to five weeks from demo to final grout. A vanities, tile & fixtures refresh in a secondary bath or condo often lands at the low end, because the plumbing stays put. Call (888) 255-9354 to set up a free on-site estimate with a written line-item quote.
How Vanities, Tile & Fixtures Work Here, Stage by Stage

Vanities, tile & fixtures is the surfacing and fit-out half of a bathroom project. It’s the part homeowners actually see and touch every day. Here’s what the schedule looks like.
Stage 1: Walkthrough and scope lock (day 1, about 90 minutes)
We measure the room, check the existing vanity rough-in, verify that the drain and supply lines line up with the new cabinet, and confirm the wall condition behind the old tile. You decide the vanity size and sink configuration here, because those two choices drive everything downstream. If you’re changing the layout, plumbing relocation moves this into permit territory, and we tell you that on the spot.
Stage 2: Demolition and substrate prep (days 2 to 4)
Out goes the old vanity, tile, and generally the drywall behind it. We set new cement or foam backer board on the floor and shower walls, then waterproof the wet areas with a roll-on membrane before any tile goes down. This stage looks slow. It’s the stage that keeps the job from leaking.
Stage 3: Tile layout and setting (days 5 to 12)
You approve a layout dry-run first, which matters more than people expect in Irvine’s narrow village bathrooms. Then we set floor tile, shower walls, and any niche or bench detail. Large-format tile (24×24 and up) sets faster per square foot but needs flatter substrate; mosaic and small hex tile take longer to lay but forgive a slightly imperfect floor.
Stage 4: Vanity, countertop, and fixture install (days 13 to 18)
The cabinet goes in, the countertop is templated and set, and the faucet, shower trim, toilet, and lighting go on. This is where you’ll want to have your fixtures already chosen and on site. Backordered faucet finishes hold up the entire punch list, and that’s a scheduling reality, not a sales line.
Stage 5: Grout, caulk, and final walkthrough (days 19 to 21)
Grout, silicone at every wet joint, glass or curtain rod, and a walkthrough where we check every penetration and run the water. You get the written punch list at the end of that day. Most single-bath jobs close out within three weeks; full primary suites with a shower rebuild and tile floor land closer to five.
If your vanities, tile & fixtures work is riding along with a larger change, that partial scope reads differently, which is why our Bathroom Remodeling in Irvine page covers the full-project version.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make on Vanities, Tile & Fixtures
Most of the money and most of the frustration live in these decisions. Get them right at the estimate and you won’t be rethinking them mid-job.
- Vanity cabinet: stock, semi-custom, or custom. Stock runs cheapest and ships fast; semi-custom (KraftMaid is a common pick here) lets you hit an odd width in a village condo bath without paying full custom. Custom gets you exactly the drawer stack you want at the highest price and the longest lead time.
- Countertop: quartz vs. granite vs. porcelain slab. Quartz holds up to daily abuse with no sealing and is the default choice in Irvine kitchens and baths alike (Cambria is a regular spec). Granite costs less for some slabs and needs periodic sealing. Porcelain slab is the new option: thin, tough, and increasingly used on shower walls, but it chips at cut edges if the installer isn’t careful.
- Tile: porcelain vs. ceramic vs. natural stone. Porcelain is denser and more chip-resistant, which matters on a floor. Ceramic is cheaper and fine on walls. Natural stone (travertine, marble) looks great and wants sealing. Large-format porcelain keeps grout lines minimal; smaller mosaic gives grip underfoot in a shower.
- Fixtures and finishes. Kohler and similar brands cover the range from builder-grade to premium. The trade-off is finish durability and warranty, not just looks. Brushed nickel and matte black have both held up; some matte finishes on inexpensive faucets show water spots badly.
- Lighting and mirror. A backlit mirror or a pair of sconces changes how tile reads. Decide this before the electrical rough-in or you’ll be patching drywall.
What Vanities, Tile & Fixtures Costs in Irvine, CA

Expect $9,000 to $28,000 for vanities, tile & fixtures on a full bathroom. That’s the lead range, and it’s real: our written estimate breaks it out line by line, so you can see exactly which items push you toward either end.
| Line item | Typical range |
|---|---|
| Bathroom vanity installation | $800 – $3,000 |
| Shower replacement (pan and tile) | $3,000 – $8,500 |
| Walk-in shower installation | $4,500 – $12,000 |
| Full vanities, tile & fixtures scope, primary bath | $9,000 – $28,000 |
Four variables move the number the most:
- Room size and tile square footage. A 5×8 secondary bath and a 10×14 primary bath are not the same job, and the tile count alone can swing $4,000.
- Relocating plumbing or electrical. Moving the drain, adding a second sink, or relocating a light fixture means opening the wall, re-roughing, and in Irvine, more inspection.
- Material grade. A porcelain-and-quartz job sits much lower than natural stone with a custom cabinet.
- Existing condition. Rot, old galvanized supply lines, or a floor that needs re-leveling adds work nobody sees in a pretty bid.
What’s included: demolition, substrate and waterproofing, tile setting and grout, vanity and countertop install, fixture install, and cleanup. What’s typically not: the fixtures and tile themselves if you buy them direct, structural repair, and any permit fees. We itemize both lists in the estimate so there are no surprises once the job starts. Upfront pricing, no change orders that weren’t agreed in writing.
See the difference
Before
After
Before
After
Before
AfterWhat Irvine Homes Specifically Do to This Job
Irvine is a master-planned city built by the Irvine Company from the 1970s onward, and that single fact reshapes how vanities, tile & fixtures work runs here. Almost every project starts with an HOA architectural-review packet before a single permit is pulled, especially in the village associations that govern Woodbridge, Northwood, and Turtle Rock. The city permit on a bath fit-out is normally a straightforward one, but the HOA submittal is the item that actually stretches the front end of the schedule. Village housing is uniformly recent: Mediterranean and Spanish-revival stucco, tile roofs, and attached townhomes and condos, so what we find behind tile is almost never ancient structure. It’s 1980s-to-2000s construction, sometimes with builder-grade galvanized lines or a shower pan that was never properly waterproofed. Water is the recurring story. Irvine’s dry, hot Santa Ana wind season pulls moisture out of homes fast, and rare intense storms send water exactly where a bad pan or a missing membrane fails. We correct that in the prep stage, not after the fact. If your roof-side details are aging at the same time, homeowners often pair this with Tile Roofing in Irvine or Specialty Roofing in Irvine. We cover Irvine across the 92612, 92603, 92616, and 92618 ZIP codes, and the wider scope of a full redo lives on our Bathroom Remodeling hub.
Serving Irvine, CA – Our Local Coverage Area
We serve Irvine and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Vanities, Tile & Fixtures in Irvine

Most projects take three to five weeks, from demolition to final punch list. A secondary bath runs close to three weeks; a primary suite with a shower rebuild and full floor tile runs closer to five. The front-end HOA architectural review can add a week or two before work begins, so build that into your planning. Call (888) 255-9354 for a schedule estimate tied to your specific room.
A straight swap of vanity, tile, and fixtures usually needs no permit, but any change to plumbing or electrical locations does. In Irvine, HOA architectural review is a separate requirement and often the longer one, especially in the village associations. We flag which approvals your project triggers during the free estimate, before you commit to anything.
Yes, and that’s the most common way we do it. Keeping the drain and supply lines where they are drops the job into the lower part of the range and shortens the schedule by roughly a week. Moving the toilet or adding a second sink is what pushes you up a tier. We tell you honestly which category your bath falls into.
The full range runs $9,000 to $28,000, with a bathroom vanity installation at $800 to $3,000 and a shower replacement at $3,000 to $8,500 on their own. Tile square footage and material grade move the number the most. Call (888) 255-9354 for an exact quote. Estimates are free and come with a written line-item breakdown.
Every vanities, tile & fixtures project is covered by our 730-Day Done Right Promise. If something isn’t right, we make it right. Our technicians have up to 12 years of experience, and projects are completed by background-checked technicians in uniform. Ask about it on the estimate call.
Get a Free Estimate on Vanities, Tile & Fixtures in Irvine
We’ll come to your home, measure the room, and hand you a written line-item estimate for your vanities, tile & fixtures project. On the call, we confirm your address, ask what you want changed, and book a walkthrough time that fits your week. Live person, 24/7, no voicemail. Financing is available at 0% for 18 months, and projects over $10,000 get $1,000 off. Call (888) 255-9354 for your free estimate.